  410   Mon Jul 11 09:46:07 2011 Damien Gallop  24/25Mg+1 from MWS for HERACLES on SEBT1Well, the plasma electrode shorted again,
and Keerthi came in on Saturday to tear down
the MWS and clean it. Beam is steady as she
  
  411   Fri Jul 15 10:30:11 2011 Damien Gallop  24/25Mg+1 from MWS for HERACLES on SEBT125Mg beam mostly sitting on FC6 now, as
HERACLES takes RIB. Source was opened
on Monday night to replace microwave window.
 Picture_6.pngPicture_7.pngPicture_8.pngPicture_9.pngPicture_10.png 
  412   Mon Jul 18 09:53:05 2011 Damien Gallop  4He from MCIS to HERACLES done Saturday and SundayKeerthi came in on Saturday morning and
set up the Supernanogan source for 4He delivery.
It looks like it went well. The original
  
  413   Mon Jul 18 10:02:42 2011 Damien Gallop  24Mg+6 from MWS for DRAGONKeerthi came in early this morning to set
up OLIS for 24Mg delivery. HEBT tuning is
in progress.
 Picture_2.pngPicture_3.pngPicture_4.png 
  414   Tue Jul 19 17:02:44 2011 Damien Gallop  27Al+1 from MCIS SetupThe DRAGON run finished this morning. Switchover
to 27Al+6 in progress now.
 Picture_5.png 
  415   Wed Jul 20 01:37:46 2011 Keerthi Jayamanna  Al beam development: 
Supernanogan is tested for Al+6
beam production.
A 8nA of mass
  
  416   Fri Jul 22 15:56:08 2011 Damien Gallop  27Al+1 from MWS for DRAGON statusThere have been teething pains developing
a good 27Al beam. The Supernanogan sputter
source ate through aluminum rods like candy.
 Picture_7.png 
  418   Mon Aug 8 17:08:28 2011 Damien Gallop  Supernanogan MROCart removed for source servicing. Source
opened and split at front seal. Ground and
plasma electrodes removed. All internal areas
 grab.w19243.pnggrab.q19378.png 
  419   Mon Aug 15 10:19:18 2011 Damien Gallop  84Kr from MWS to TITANThe source was configured and switched
over on Friday. Some teething pains over
the weekend. Beam is on FC6 presently.
 Picture_18.pngPicture_17.png 
  420   Fri Aug 19 10:01:52 2011 Damien Gallop  17O3+ from MCIS to DRAGONSetup in progress. No foil at M:5. Source
has been running since yesterday. Note that
source was opened recently for MRO. Vacuum
 Picture_20.pngPicture_21.png 
  421   Mon Aug 22 09:49:34 2011 Damien Gallop  17O3+ from MCIS to DRAGONDelivery continues. The attached vacuum
trar suggests that this is about as good
as it's going to get. On the other hand,
 Picture_25.png 
  422   Wed Aug 24 10:49:41 2011 Damien Gallop  17O3+ from MCIS to DRAGONDelivery continues. There were several
"PV1" trips over the past several
days. ICR now has a recipe for resetting
 Picture_20.pngPicture_21.pngPicture_22.png 
  423   Thu Aug 25 10:54:34 2011 Damien Gallop  17O3+ from MCIS to DRAGONDelivery continues.  Picture_24.pngPicture_25.pngPicture_26.pngPicture_27.pngPicture_28.png 
  424   Mon Aug 29 10:03:05 2011 Damien Gallop  17O3+ from MCIS to DRAGONDelivery continues on autopilot. Looking
good.
ICR noted that a seemingly unusual number
  
  425   Tue Aug 30 10:01:30 2011 Damien Gallop  17O3+ from MCIS ReservedWe are on orders to retain OLIS for accelerator
development. The switchover to 58Ni, scheduled
for this morning, is on hold.
 Picture_32.png 
  426   Tue Aug 30 16:40:14 2011 Damien Gallop  58Ni1+ from MWS to TITAN SetupSource switchover from MCIS to MWS. Support
gases and liners were pre-fitted. Source
lit. Optics set for 20keV operation. ~50pA
 Picture_33.pngPicture_34.pngPicture_36.png 
  427   Wed Aug 31 12:12:39 2011 Damien Gallop  58Ni1+ from MWS to TITAN SetupBeam on FC6 drifted overnight. Touch up
a few things, notably the EE. 25pA on FC6
presently. I also increased microwave power
 Picture_37.pngPicture_38.png 
  428   Thu Sep 1 10:01:25 2011 Damien Gallop  58Ni1+ from MWS to TITANBeam was established yesterday. It has
grown nicely overnight.
 Picture_39.png 
  429   Fri Sep 2 10:04:55 2011 Damien Gallop  58Ni1+ from MWS to TITANBeam idled overnight. Average ~50pA at
FC6. About half that on ILE2T:FC3 presently.
Setup on TITAN side in progress.
 9x 
  430   Tue Sep 6 16:37:24 2011 Damien Gallop  58Ni1+ from MWS to TITANPilot beam delivery continues. Keerthi
came in over the Labor Day weekend to help
out on something.
 Picture_50.png 