ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
302
|
Mon Jun 28 09:19:16 2010 |
Damien Gallop | | | 24Mg5+ to TIGRESS | Delivery looks like it was pretty smooth
over the weekend. TIGRESS expects to receive
24Na from ITW via the CSB this week. Yield |
|
303
|
Tue Jun 29 09:16:33 2010 |
Damien Gallop | | | 24Mg5+ to TIGRESS | Delivery to TIGRESS has begun. Beam from
the source looks perfect. Looks like happy
times for them. The plan is to eventually |
6x |
304
|
Wed Jun 30 09:11:25 2010 |
Damien Gallop | | | 24Mg5+ to TIGRESS | Delivery / standby continues. |
 |
413
|
Mon Jul 18 10:02:42 2011 |
Damien Gallop | | | 24Mg+6 from MWS for DRAGON | Keerthi came in early this morning to set
up OLIS for 24Mg delivery. HEBT tuning is
in progress. |
  |
409
|
Fri Jul 8 10:07:14 2011 |
Damien Gallop | | | 24/25Mg+1 from MWS for HERACLES on SEBT1 |
Beam on FC6 overnight and very stable.
It grew overnight and continues to grow, |
8x |
410
|
Mon Jul 11 09:46:07 2011 |
Damien Gallop | | | 24/25Mg+1 from MWS for HERACLES on SEBT1 | Well, the plasma electrode shorted again,
and Keerthi came in on Saturday to tear down
the MWS and clean it. Beam is steady as she |
|
411
|
Fri Jul 15 10:30:11 2011 |
Damien Gallop | | | 24/25Mg+1 from MWS for HERACLES on SEBT1 | 25Mg beam mostly sitting on FC6 now, as
HERACLES takes RIB. Source was opened
on Monday night to replace microwave window. |
    |
407
|
Wed Jul 6 13:20:15 2011 |
Damien Gallop | | | 24/25Mg+1 from MWS Setup | Source opened, and aluminum components
removed. Magnesium components from previous
run cleaned and installed. Pumpdown in progress. |
 |
408
|
Thu Jul 7 10:40:27 2011 |
Damien Gallop | | | 24/25Mg+1 from MWS Setup | Source conditioned nicely overnight at
55kV with a little RF power on. Source gases
checked, final cage inspection. Ready to |
6x |
151
|
Tue Oct 6 15:22:43 2009 |
Damien Gallop | | | 22Ne4+ & 20Ne4+ operation | Over the weekend, Keerthi had set up 22Ne4+
to FC6 for the purpose of developing a tune
matched with a similar tune from the CSB. |
|
397
|
Thu Jun 9 16:51:09 2011 |
Damien Gallop | | | 22Ne2+ for TUDA-II Pilot Beam | MWS online. Note: A/q display is white.
Possible culprit: IOSIOC. ICR will reboot
it at first convenient opportunity. |
    |
398
|
Fri Jun 10 11:35:24 2011 |
Damien Gallop | | | 22Ne2+ for TUDA-II Pilot Beam | MWS online. Beam sitting on FC6.
Mel returned two flow controllers
today, borrowed in March |
|
396
|
Mon May 30 14:44:01 2011 |
Damien Gallop | | | 22Ne2+ for ICR Training | MWS online. Separator magstab program offline.
Check: Kepco is switched off and one lead
is physically cut and taped over. That's |
|
272
|
Tue May 18 09:03:32 2010 |
Damien Gallop | | | 22Ne2+ at 22.44keV for SEBT1 EOB | EOB for SEBT1 run at 08:30, taking 11Li
from ITE and 22Ne2+ from OLIS when needed.
Attempted emittance scans last evening, but |
  |
258
|
Fri Apr 30 13:02:17 2010 |
Damien Gallop | | | 22Ne2+ at 22.44keV for SEBT1 | Mid-morning the source was switched over
from 16O1+ to 22Ne2+ operation for a new
experiment. OLIS will be used as the pilot |
|
259
|
Mon May 3 18:12:12 2010 |
Damien Gallop | | | 22Ne2+ at 22.44keV for SEBT1 | Beam was switched on Friday morning from
16O1+ to 22Ne2+. This time it's a pilot beam
for a 11Li experiment. |
|
260
|
Tue May 4 14:19:18 2010 |
Damien Gallop | | | 22Ne2+ at 22.44keV for SEBT1 | Beam from MWS continues for pilot beam
use into SEBT1. There are cyclotron issues
with cryogenics, so 11Li delivery from ITE |
|
261
|
Wed May 5 09:46:40 2010 |
Damien Gallop | | | 22Ne2+ at 22.44keV for SEBT1 | Beam on standby for pilot beam. Cyclotron
is still down with vacuum troubles since
~03:00, so no RIB to ISAC. |
|
262
|
Thu May 6 14:33:07 2010 |
Damien Gallop | | | 22Ne2+ at 22.44keV for SEBT1 | Beam from MWS remains quietly sitting on
FC6, on standby for pilot beam use to SEBT1.
The cyclotron is still down with cryogenerator |
|
265
|
Mon May 10 09:39:34 2010 |
Damien Gallop | | | 22Ne2+ at 22.44keV for SEBT1 | Supernanogan development, mainly for the
sake of the upcoming 33S run, took place
for a little while on Friday. It was expected |
|