OLIS Logbook
General
General, Page 17 of 26
Not logged in
List
|
Find
|
Select
|
Import
|
Login
|
Help
Full
| Summary |
Threaded
513 Entries
Goto page
Previous
1
,
2
,
3
...
16
, 17,
18
...
24
,
25
,
26
Next
ID
Date
Author
Type
Category
Subject
Text
281
Thu May 27 09:11:10 2010
Damien Gallop
33S Development and Handover
33S on FC6 overnight. Preparing to send
beam to DRAGON
now, and confirm isotope.
282
Fri May 28 11:02:59 2010
Damien Gallop
33S to DRAGON
Beam tuning in progress. Source gas canister
at -20"Hg. MCIS pressure at 7.62e-8
Torr.
283
Mon May 31 09:18:39 2010
Damien Gallop
33S to DRAGON
Delivery of 33S6+ to DRAGON continues.
A couple of RF tweaks done over the weekend.
Source gas canister pressure at -20"Hg.
284
Tue Jun 1 09:12:39 2010
Damien Gallop
33S to DRAGON
33S6+ delivery to DRAGON continues. Looks
like there was an RF tweak overnight. Source
gas canister still at ~-20"Hg. MCIS
285
Wed Jun 2 09:19:04 2010
Damien Gallop
33S to DRAGON
33S6+ delivery to DRAGON continues. It
is Maintenance Day for everybody else today.
Source gas canister pressure = -20"Hg.
286
Thu Jun 3 09:29:11 2010
Damien Gallop
33S to DRAGON
33S6+ delivery to DRAGON continues until
Saturday morning. All the signs are that
beam is excellent. Source gas canister is
287
Fri Jun 4 09:30:48 2010
Damien Gallop
33S to DRAGON
Delivery of 33S6+ continues to DRAGON for
the final day. Some online tuning of the
line overnight. Source gas canister pressure
288
Mon Jun 7 10:36:14 2010
Damien Gallop
15N setup over the weekend
Keerthi set up the Supernanogan for 15N
operation and destined for TIGRESS, using
two source gas options: a miniature bottle
289
Tue Jun 8 09:27:54 2010
Damien Gallop
15N4+ to TIGRESS
User tuning began Sunday night. Beam physics
expert chose to retire the IOS:Q1 defeat,
as he did not know until yesterday that it
290
Wed Jun 9 10:07:33 2010
Damien Gallop
15N4+ to TIGRESS
Setup into ISAC-II began last night. Tuning
is in progress now. Beam on FC6 overnight.
Canister pressure is -22"Hg and MCIS
291
Thu Jun 10 09:17:42 2010
Damien Gallop
15N4+ to TIGRESS
Delivery to TIGRESS began yesterday
or so. ICR reported beam intensity drops
overnight. I'll look at it presently. Meanwhile,
292
Fri Jun 11 09:21:24 2010
Damien Gallop
15N4+ to TIGRESS
Delivery of 15N4+ to TIGRESS continues.
Source gas canister is still at ~-22"Hg,
and MCIS pressure is 7.2e-8 Torr. ICR reported
293
Sat Jun 12 10:20:14 2010
Damien Gallop
15N4+ to TIGRESS done
Delivery to TIGRESS ended this morning
as scheduled. ICR took nice emittance
scans and is completing a target snapshot
13x
294
Sat Jun 12 11:23:40 2010
Damien Gallop
26Mg6+ to TUDA-II source setup
After EOB activities from 15N4+ run that
ended this morning, we have begun preparations
to switch over the ion sources. Turbos off
295
Mon Jun 14 09:44:06 2010
Damien Gallop
26Mg6+ for TUDA-II
On Saturday we opened the MWS and set it
up for Mg operation. Everything went well.
We are using the pair of half-moon Mg metal
296
Wed Jun 16 10:12:58 2010
Damien Gallop
26Mg6+ for TUDA-II
Beam idle overnight. Beam is being used
as a pilot beam for this run. Source was
knocked off by a power
297
Thu Jun 17 09:21:56 2010
Damien Gallop
26Mg6+ for TUDA-II
TUDA-II began taking beam around midnight
last night. Beam on FC6 for a good part of
the night. Steady as she goes.
298
Mon Jun 21 09:20:30 2010
Damien Gallop
26Mg6+ for TUDA-II
Beam waiting quietly on FC6. There was
a power
bump on Friday just after noon that tripped
299
Tue Jun 22 08:42:33 2010
Damien Gallop
26Mg6+ for TUDA-II
Beam was redirected to TIGRESS yesterday.
RIB delivery to TIDA-II was rendered impossible
due to a failure in the target or module.
300
Wed Jun 23 09:17:34 2010
Damien Gallop
24Mg5+ to TIGRESS setup
Mass change yesterday morning from 26Mg1+
to 24Mg1+ from the MWS. It was tough to get
stable beam from the source, and there are
Goto page
Previous
1
,
2
,
3
...
16
, 17,
18
...
24
,
25
,
26
Next
ELOG V2.9.2-2455