  213   Wed Dec 16 14:07:37 2009 Damien Gallop  OLIS development for CUSP source continued Today we vary source gas pressure.
Later... Several iterations of pressure,
tuning and standing on our heads. Representative
 grab.n10208.pnggrab.o10214.pnggrab.G10224.pnggrab.T10230.png 
  212   Tue Dec 15 17:50:38 2009 Damien Gallop  OLIS development for CUSP source continued Four larger apertures were installed yesterday.
This morning we fired up the modified source.
It lit immediately. Plenty of beam. Development
  
  211   Mon Dec 14 10:01:52 2009 Damien Gallop  OLIS development for CUSP source continuedDevelopment over the weekend. Results to
come. Restart source now and let it warm
up. 4He2+ on FC6. Plasma at zero, to duplicate
  
  210   Fri Dec 11 18:03:30 2009 Damien Gallop  OLIS development for CUSP source continued Today we swapped power supplies between
the arc and plasma electrode. This gives
us a higher voltage range on the arc, at
  
  209   Thu Dec 10 08:59:05 2009 Damien Gallop  OLIS development for CUSP source continued Source stayed up quietly overnight. Current
dropped off gradually. I will tweak things
shortly.
 Picture_12.pngPicture_13.png 
  208   Wed Dec 9 10:24:45 2009 Damien Gallop  OLIS development for CUSP source continuedCUSP source was off for the night, following
Keerthi's development. He had increased the
current on FC6 and the arc current substantially.
 grab.k18688.pngPicture_5.pngPicture_6.pngPicture_7.pngPicture_8.png 
  207   Tue Dec 8 12:40:17 2009 Damien Gallop  OLIS development for CUSP source continuedFuse for FUG power supply obtained and
installed. Source is up and warming up. ~100enA
on FC6.
 grab.M11379.pnggrab.S11386.png 
  206   Mon Dec 7 09:48:24 2009 Damien Gallop  OLIS development for CUSP source continuedThe OLIS cage was open over the weekend.
IOS pressure is in the 4e-7 range, with source
gas manifold closed and external helium bottle
 Picture_4.png 
  205   Fri Dec 4 18:15:19 2009 Damien Gallop  OLIS development for CUSP source - gas lines & waterWe received back the source this morning.
First order of business was to take some
EOB scans. See earlier entry. Then we shut
  
  204   Fri Dec 4 09:58:08 2009 Damien Gallop  20Ne1+ at 28keV for 8pi delivery completeMike declared successful EOB this morning.
"Best beam I ever used" or something
like that! EOB emittance and mass scans attached.
 grab.InU319.pnggrab.YPZ323.pnggrab.RXD329.pnggrab.aGj522.pngPicture_1.png 
  203   Thu Dec 3 14:12:56 2009 Damien Gallop  20Ne1+ at 28keV for 8pi delivery continuesBeam was idle overnight. We took the beam
for a while this morning, and ran a mass
scan. We opted to not go into the cage to
 Picture_20.png 
  202   Wed Dec 2 19:03:55 2009 Damien Gallop  20Ne1+ at 28keV for 8pi deliveryThe source ran well overnight and today.
There is an issue with an ILE Faraday cup.
Tuning is ended for today, and beam is on
 Picture_19.png 
  201   Tue Dec 1 12:33:58 2009 Damien Gallop  20Ne1+ at 28keV for 8piBy agreement, we are providing OLIS beam
to the Beam Delivery group for the purpose
of checking out transmission in the 8pi line.
 8x 
  200   Tue Dec 1 09:27:17 2009 Damien Gallop  OLIS development for CUSP source - first overnight runningThe CUSP source ran well overnight, notwithstanding
local control of source power supplies. Filament
supply had dropped to 115A this morning,
 Picture_16.pngPicture_15.png 
  199   Mon Nov 30 16:53:31 2009 Damien Gallop  20Ne1+ to 8pi planned for tomorrowOLIS beam to 8pi is planned for tomorrow.
A 20Ne1+ beam of ~3nA at 28keV is the agreement.
The 8pi line diagnosis is likely to take
  
  198   Mon Nov 30 15:41:00 2009 Damien Gallop  OLIS development for CUSP source - initial testsWe completed the services by end of last
week. Of course they could always be better,
but everything is fine for this iteration.
  
  197   Mon Nov 30 15:41:00 2009 Damien Gallop  OLIS development for CUSP source - initial testsWe completed the services by end of last
week. Of course they could always be better,
but everything is fine for this iteration.
 Picture_14.png 
  196   Fri Nov 27 13:36:09 2009 Damien Gallop  OLIS development for CUSP source - installation cont'dArc power supply replaced. Water leaks
down to one or two pinholes on source body;
manageable. Minor mechanical in progress.
  
  195   Thu Nov 26 16:08:42 2009 Damien Gallop  OLIS development for CUSP source - installation cont'dServices completed today. There are still
some teething pains, particularly the arc
p/s as noted earlier. But we did have some
 grab.I31500.png 
  194   Thu Nov 26 06:22:58 2009 Keerthi Jayamanna  Cusp sourceArc power supply does not hold any voltage.   