  339   Thu Sep 23 09:20:34 2010 Damien Gallop  4He1+ for DRAGONDRAGON continues to take MWS beam.
Later... 14:00 EOB. Prepare for Mini-Shutdown.
 Picture_1.pngPicture_1.pngPicture_2.pngPicture_3.png 
  330   Mon Aug 9 10:38:43 2010 Damien Gallop  4He1+ Setup for SCC DevelopmentWe have a request
for changing over the source to 4He1+ operation
from the MWS.
  
  412   Mon Jul 18 09:53:05 2011 Damien Gallop  4He from MCIS to HERACLES done Saturday and SundayKeerthi came in on Saturday morning and
set up the Supernanogan source for 4He delivery.
It looks like it went well. The original
  
  432   Thu Sep 8 11:21:45 2011 Damien Gallop  4He from MCIS to DRAGON SetupThe 58Ni delivery from MWS to TITAN ended
last evening. Beam was unused from about
18:30, and source switchover began at about
 Picture_53.png 
  433   Mon Sep 12 10:04:42 2011 Damien Gallop  4He from MCIS to DRAGON EOBDelivery continued through the weekend.
Some 300nA on FC6. The run ended at around
09:00. Source switchover is in progress now.
 Picture_1.pngPicture_2.png 
  443   Tue Sep 27 13:29:23 2011 Damien Gallop  36/40Ar development with MCISBeam development for forthcoming 36Ar run
is in progress. Initial yield numbers have
been determined. Source is running with Ar
  
  444   Wed Sep 28 11:56:15 2011 Damien Gallop  36/40Ar development with MCIS40Ar source gas, ergo 40Ar+x beams. 40Ar+6
earlier, and 40Ar+7 presently.
 Picture_21.png 
  445   Thu Sep 29 10:50:30 2011 Damien Gallop  36/40Ar development with MCISDevelopment with Supernanogan source continues.
Present beam is 40Ar+7, about 70enA.
  
  327   Thu Aug 5 18:56:48 2010 Damien Gallop  35Cl2+ setup for DRAGONOLIS off Wednesday morning for source changeover
from 16O3+ to 35Cl2+. We have elected to
use the MWS for this run. Supernanogan is
  
  328   Fri Aug 6 09:50:22 2010 Damien Gallop  35Cl2+ setup for DRAGONFirst beam appearing on FC6 presently,
after the source pumped overnight. Source
gas valving set up earlier this morning.
 6x 
  329   Mon Aug 9 09:09:36 2010 Damien Gallop  35Cl2+ for DRAGONBeam ran quietly over the weekend, with
the anticipated intensity drop-off. Source
gas canister at ~15"Hg and IOS at 3.3e-7
 Picture_24.png35Cl2_Startup.png 
  148   Fri Oct 2 09:38:26 2009 KeerthiRoutineGeneral33Sulfur development completed successfully. 
Sulfur-33
development completed successfully.
  
  147   Wed Sep 30 15:30:04 2009 Damien Gallop  33S6+ from MCIS for DRAGON setupBeam is stable enough to let Marco set
up something to DRAGON. We are a couple of
days early.
 grab.sA3956.pnggrab.ar3960.png 
  145   Mon Sep 28 14:12:17 2009 Damien Gallop  33S5+ from MCIS on Friday 25-Sep-2009A sustained 33S5+ beam was generated in
the Supernanogan on Friday, September 25th.
Attached is a trar plot.
 33S_from_MCIS_25-Sep-2009.png 
  458   Mon Oct 31 11:04:06 2011 Damien Gallop  33S+6 from MCIS to DRAGON EOBDeliver concluded yesterday morning around
09:00.
Pity to have to switch off the source. OLIS
 Picture_17.png 
  454   Mon Oct 24 10:10:34 2011 Damien Gallop  33S+6 from MCIS to DRAGONDelivery since Friday
Beam on but intensity
is dropping, suggesting that enriched 33S
 Picture_10.png 
  455   Tue Oct 25 09:41:32 2011 Damien Gallop  33S+6 from MCIS to DRAGONBeam petered out earlier this morning after
an attempt to tweak the RF frequency. Restored.
Plasma was on throughout. ICR has lowered
 Picture_12.png 
  456   Wed Oct 26 10:17:53 2011 Damien Gallop  33S+6 from MCIS to DRAGONDelivery continued
uneventfully overnight and is continuing.
Later... source is just getting better
 Picture_13.pngPicture_14.png 
  457   Fri Oct 28 10:18:53 2011 Damien Gallop  33S+6 from MCIS to DRAGONDelivery continued overnight.  Picture_16.png 
  282   Fri May 28 11:02:59 2010 Damien Gallop  33S to DRAGONBeam tuning in progress. Source gas canister
at -20"Hg. MCIS pressure at 7.62e-8
Torr.
 Picture_1.png 