  229   Fri Feb 19 17:54:40 2010 Damien Gallop  OLIS Shutdown in progressPartial disassembly of DB1 optics today.
Shielding of insulators is definitely working
and indicated for unshielded insulators.
 DSCN7351.JPGDSCN7355.JPG 
  230   Thu Mar 11 23:02:18 2010 Keerthi  OLIS status after shutdownMicrowave source is up and running.
Supernanogan: grounding rod is stuck,
RF generator does not clear the interlocks
  
  231   Fri Mar 12 11:33:09 2010 Keerthi  IOS:IG!IOS:IG1 is faulty. Need to replac it during
next earliest window.
  
  232   Fri Mar 12 11:35:34 2010 Keerthi  Cusp water coolingCusp source water cooling (#4)  interlick
does not work.
  
  233   Wed Mar 17 09:25:27 2010 Damien Gallop  20Ne1+ at 40.8keV for accelerator commissioning20Ne1+ set up from the MWS and handed over
to Sophia & Marco for accelerator recommissioning.
Strip to 5+ at M:5. First day of beam. Happy
 Picture_2.pngPicture_3.pngPicture_4.png 
  234   Fri Mar 19 09:00:21 2010 Damien Gallop  20Ne1+ at 40.8keV for accelerator commissioningMWS is running well. Tune save: 100319_0901.snapiosdragon
with beam observed to Prague magnet. Stripchart
of last 24h attached.
 Picture_5.png 
  235   Wed Mar 24 11:42:32 2010 Damien Gallop  20Ne1+ at 40.8keV for accelerator commissioningBeam is on standby. Target
snapshot in IOPS elog.  Over the
last little while...
 Picture_9.png 
  236   Thu Mar 25 12:43:16 2010 Damien Gallop  20Ne1+ at 40.8keV for accelerator commissioningBeam stable as a rock overnight. Pity we
have no-one using it at the moment! Stripchart
attached.
 Picture_8.png 
  237   Fri Mar 26 09:31:04 2010 Damien Gallop  20Ne1+ at 40.8keV for accelerator commissioningBeam idling overnight. Yesterday ICR called
me regarding an IOSIOC reboot and consequent
fallout. In short, it turned off IOS:MB.
 Picture_10.png 
  238   Mon Mar 29 12:15:00 2010 Damien Gallop  20Ne1+ at 40.8keV for accelerator commissioningOLIS sprung a water leak last night. Problem
was sparking through a coiled  cooling
line. I replaced the pair of cooling lines
  
  239   Tue Mar 30 10:27:09 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning16O1+ beam requested yesterday. Source
switched over and beam ready by evening.
Nice overnight Stripchart, attached. Sophia
 Picture_12.png 
  240   Wed Mar 31 09:43:30 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam set up for accelerator commissioning.
Sophia took beam yesterday. Beam idle overnight.
Stripchart of overnight performance attached.
 Picture_13.png 
  241   Thu Apr 1 09:23:08 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam idle overnight. Another night of super-stable
beam. If no users today, then we may take
it for MRO.
 Picture_1.png 
  242   Mon Apr 12 11:53:22 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam was used last week for DRAGON commissioning.
Successful run, completed yesterday, as reported
by Colin this morning.
 Picture_1.pngPicture_2.png 
  243   Tue Apr 13 10:20:27 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningAccelerator commissioning has resumed for
the day. Beam was nice and stable overnight.
See attached Stripchart.
 Picture_3.png 
  244   Wed Apr 14 17:28:32 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam reserved for continuing accelerator
development, but there are some ISAC-I RF
phase troubles. However, maintenance was
  
  245   Thu Apr 15 09:39:11 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningYesterday's RF troubles in ISAC-I are reportedly
solved. Beam development is expected to resume
this morning.
  
  246   Fri Apr 16 09:26:01 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam development through accelerators continues
today. Beam was rock-stable overnight.
 grab.Ft9922.png 
  247   Mon Apr 19 10:11:17 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningDevelopment on Friday; idle over the weekend.
Stripchart attached.
Meanwhile, there was a power bump
 Picture_1.pnggrab.a19570.png 
  248   Mon Apr 19 17:12:55 2010 Damien Gallop  OLIS MaintenanceJust in: an active work permit for OLIS
maintenance. Underway through tomorrow (Tuesday)
evening.
  