OLIS Logbook General
  General, Page 26 of 26  Not logged in ELOG logo
ID Date Author Type Category Subjectup Text Attachments
  7   Fri May 22 15:03:55 2009 Damien GallopRoutineGeneralTemporary fix on IOS:TP7Vacuum Group applied a temporary fix to
the lower body seal on IOS:TP7, which we
found last night to be leaking. Edi tells
  
  1   Thu May 14 11:07:33 2009 Hossein Rafighi  TestTesting!   
  6   Fri May 22 12:31:36 2009 Raymond Dubé  TestHello world   
  137   Tue Sep 15 16:56:03 2009 Damien Gallop  Test scans for publicationHere are pix of the same scan: original,
then greyscale, then cropped, using The GIMP.
Not bad.
 grab.E19994.pnggrab.U19879-greyscale.pnggrab.U19879-cropped.png 
  144   Wed Sep 16 18:14:29 2009 Damien Gallop  Test scans for publication 2090916_1206ILTEMIT.txt
Graphics with "color" in
the filename will look in print the same
 19x 
  484   Fri Oct 10 14:02:56 2014 Raymond DubeRoutineGeneralTest with new Alga, ALPA 50W RF AMPWe did a test yesterday with the new Alga
Microwave RF AMP, model # ALPA 50 Watt, serial
# 130684 to be used for the MCIS.  We
 ALPA-RF_AMP-50W.pdf 
  2   Thu May 14 12:02:09 2009 Damien GallopRoutineGeneralTesting 2My first OLIS elog entry.   
  385   Tue Feb 22 18:52:53 2011 Keerthi Jayamanna  Ti+7 efficiency studies2mm diameter Ti was installed to set the
optics. Later 0.0005 in thick foil will be
installed for real efficiency studies.
  
  390   Sat Feb 26 22:06:03 2011 Keerthi Jayamanna  Ti+7 status90pA of Ti+7 is running smoothly. 22:05 
Feb26th
  
  389   Fri Feb 25 17:27:11 2011 Keerthi Jayamanna  Titaniums efficiency testSmall peice of titanium wire is installed
and running aroung 100pA of Ti+7 at FC6.
OSAC are OPs taking data.
  
  388   Fri Feb 25 17:27:11 2011 Keerthi Jayamanna  Titaniums efficiency testSmall piece of titanium foil 0.0005"
thick is installed and running around 100pA
of Ti+7 at FC6.
  
  158   Sun Oct 11 17:09:52 2009 Keerthi  Vacuum with IOS:IV7IOS:IG4 reads 1.25 e-7 Torr and IOS:IG1
reads 9.8e-8 Torr with IOS:IV7 is open
IOS:IG4 reads 8.35 e-8 Torr and IOS:IG1
  
  485   Tue Oct 14 08:31:53 2014 Brian MinatoOtherGeneralWater Flow Switch #3This entry was incorrectly added to the
OLIS logbook.  it has been moved to
the I3 logbook.
  
ELOG V2.9.2-2455