OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 461     Entry time: Wed Nov 2 10:16:49 2011
Author: Damien Gallop 
Type:  
Category:  
Subject: OLIS Shutdown 

MCIS pumpdown continues well. IOS optics coming along. DB3 installed last night and IOS is under vacuum very early. DB1/2 optics will remain out until the end of the next-up MCIS run.

Attachment 1: Picture_21.png  40 kB  | Hide | Hide all
Picture_21.png
ELOG V2.9.2-2455