OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 459     Entry time: Mon Oct 31 11:06:58 2011
Author: Damien Gallop 
Type:  
Category:  
Subject: OLIS Shutdown 

Two weeks of OLIS Shutdown have begun. The plan is to complete refurbishing this week and pump next week, with 36Ar+6 beam ready at the end of it. IOS is vented and open. The Supernanogan cart is out, vented and open. Plasma chamber cleaning and refurbishing in situ are in progress. The IOS upstream optics DB1-3 have been removed for refurbishing on the bench.

Later... Supernanogan MRO completed and closed. Pumping underway by ~15:30. Leakup curve appended below.

Attachment 1: grab.g18922.png  27 kB  Uploaded Mon Oct 31 16:48:07 2011  | Hide | Hide all
grab.g18922.png
ELOG V2.9.2-2455