OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 408     Entry time: Thu Jul 7 10:40:27 2011
Author: Damien Gallop 
Type:  
Category:  
Subject: 24/25Mg+1 from MWS Setup 

Source conditioned nicely overnight at 55kV with a little RF power on. Source gases checked, final cage inspection. Ready to start.

Later... Source is lit. Let it grow.

Later... Lots of beam on FC3 but not a lot on FC6. Beam is broad. Hand it over to ICR for the night as-is.

Attachment 1: grab.R15114.png  27 kB  | Show | Hide all
Attachment 2: Picture_1.png  53 kB  Uploaded Thu Jul 7 12:38:12 2011  | Hide | Hide all
Picture_1.png
Attachment 3: Picture_2.png  54 kB  Uploaded Thu Jul 7 12:38:25 2011  | Show | Hide all
Attachment 4: Picture_46.png  44 kB  Uploaded Thu Jul 7 20:00:27 2011  | Show | Hide all
Attachment 5: Picture_47.png  57 kB  Uploaded Thu Jul 7 20:01:03 2011  | Show | Hide all
Attachment 6: Picture_48.png  47 kB  Uploaded Thu Jul 7 20:01:28 2011  | Show | Hide all
ELOG V2.9.2-2455