OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 407     Entry time: Wed Jul 6 13:20:15 2011
Author: Damien Gallop 
Type:  
Category:  
Subject: 24/25Mg+1 from MWS Setup 

Source opened, and aluminum components removed. Magnesium components from previous run cleaned and installed. Pumpdown in progress.

Later... Pumpdown looks wonderful. A couple of cycles with partial vent with N2 to help evaporate the methanol.

Later... Power is on. HV at 55kV for the night to condition. No plasma, no beam overnight.

Attachment 1: grab.jS3278.png  29 kB  Uploaded Wed Jul 6 14:48:47 2011  | Show | Show all
Attachment 2: grab.FQ5737.png  22 kB  Uploaded Wed Jul 6 19:23:51 2011  | Show | Show all
ELOG V2.9.2-2455