OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 397     Entry time: Thu Jun 9 16:51:09 2011
Author: Damien Gallop 
Type:  
Category:  
Subject: 22Ne2+ for TUDA-II Pilot Beam 

MWS online. Note: A/q display is white. Possible culprit: IOSIOC. ICR will reboot it at first convenient opportunity.

Earlier, Supernanogan was set up with empty canister in preparation for Kr heavy ion run planned for this weekend. Canister and lines pumpdown in progress. However, a FR was issued for MCIS:BP1, which is losing ground pretty quickly. The two MCIS screenshots below were taken some five minutes apart. At this rate, there is no way the pump can bring the system to an operational pressure in time. For good measure, power-cycle BP1 now... it doesn't help.

Attachment 1: Picture_1.png  24 kB  | Show | Show all
Attachment 2: Picture_4.png  23 kB  | Show | Show all
Attachment 3: Picture_3.png  24 kB  | Show | Show all
Attachment 4: Picture_2.png  48 kB  | Show | Show all
Attachment 5: Picture_5.png  38 kB  | Show | Show all
ELOG V2.9.2-2455