OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 373     Entry time: Thu Dec 2 10:02:46 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: 12C2+ for Commissioning 

Accelerator development continues. Save: 101201_2157.snaiosvault. Today's agenda: emittance scans. Attached: overnight beam plus a preliminary horizontal emittance scan 101202_0951ILTEMIT.txt.

Later... First good scan 101202_1016ILTEMIT.txt.

Next... Second scan 101202_1016ILTEMIT.txt with FC at lower gain, due to lots of red in the first scan. Too noisy.

Next... Third scan 101202_1041ILTEMIT.txt, first the raw pic, then filtered a couple of ways.

Scanner parked, and beam on FC6 again. There is interest in doing a vertical scan. This will require physically moving the emittance rig to the perpendicular face of its diagnostics box. Awaiting decision.

Attachment 1: Picture_1.png  32 kB  | Show | Hide all
Attachment 2: Picture_2.png  48 kB  | Show | Hide all
Attachment 3: Picture_3.png  28 kB  | Show | Hide all
Attachment 4: Picture_4.png  50 kB  | Show | Hide all
Attachment 5: Picture_5.png  37 kB  | Show | Hide all
Attachment 6: Picture_6.png  35 kB  | Show | Hide all
Attachment 7: Picture_8.png  53 kB  | Show | Hide all
Attachment 8: Picture_9.png  108 kB  | Show | Hide all
Attachment 9: Picture_10.png  28 kB  | Show | Hide all
Attachment 10: Picture_11.png  57 kB  | Show | Hide all
Attachment 11: Picture_12.png  37 kB  | Show | Hide all
Attachment 12: Picture_13.png  57 kB  | Show | Hide all
Attachment 13: Picture_14.png  28 kB  | Hide | Hide all
Picture_14.png
Attachment 14: Picture_15.png  34 kB  | Show | Hide all
ELOG V2.9.2-2455