OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 367     Entry time: Wed Nov 24 14:02:14 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: 85Rb for TITAN 

Last day of 85Rb delivery. Save: 101124_1400_snapiostitan. Next up: 12C2+ for SEBT commissioning. We took a few minutes earlier to see if this is available with the source as-is. No such luck. Plan is to shut off mid-afternoon, and prepare to switch over to 12C2+ operation from the MWS.

Attachment 1: Picture_5.png  45 kB  | Hide | Hide all
Picture_5.png
Attachment 2: Picture_6.png  42 kB  | Show | Hide all
Attachment 3: Picture_7.png  72 kB  | Show | Hide all
ELOG V2.9.2-2455