OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 363     Entry time: Mon Nov 8 09:37:03 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: 12C2+ for DRAGON 

The 85/87Rb run from the MWS ended last evening as scheduled. The Supernanogan source was brought online (~21:30 Sunday?) and a 12C2+ beam established, first for ICR training then for DRAGON setup.

Attachment 1: Picture_1.png  40 kB  | Hide | Hide all
Picture_1.png
ELOG V2.9.2-2455