Message ID: 356     Entry time: Thu Oct 28 17:51:49 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: MWS switchover for scheduled 85/87Rb beams 

A controls issue with IOS:BIAS was found yesterday. Controls people resolved it today. MWS source was switched over and prepared for Rb beam. Leakchecking done: tight. Source should pump for a little while longer before energizing. At present, leak detector is attached to the IOS roughing line. Pic attached with IOS:BP1 alternately online and offline.

Note: Source gas hand valve is CLOSED.

Attachment 1: grab.N32655.png  26 kB  Uploaded Thu Oct 28 19:11:06 2010  | Hide | Hide all