OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 355     Entry time: Thu Oct 28 17:51:49 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: MWS switchover for scheduled 85/87Rb beams 

A controls issue with IOS:BIAS was found yesterday. Controls people resolved it today. MWS source was switched over and prepared for Rb beam. Leakchecking done: tight. Source should pump for a little while longer before energizing. At present, leak detector is attached to the IOS roughing line.

Later... Noticed that MCIS:TP2 was tripped off. After a couple of tries, it restarted okay. Hmm...

Attachment 1: Picture_1.png  21 kB  Uploaded Mon Nov 1 15:07:31 2010  | Hide | Hide all
Picture_1.png
ELOG V2.9.2-2455