OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 335     Entry time: Tue Sep 14 09:18:28 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: MCIS Development 

The 16O3+ DRAGON run just finished. MCIS Development begins this morning for a few days. The goal is to install and characterize the new sputter ion source.

Below are vacuum pics before and after closing MCIS:IV0. There was a bit of a spike during closing. All three turbos switched off. TP3 is down now.

Later... Keerthi requests we look at 16O7+ production as a measure of source performance. Done. Chart appended below, with source panels. Mass scan next.

Attachment 1: Picture_1.png  42 kB  | Show | Show all
Attachment 2: Picture_2.png  43 kB  | Show | Show all
Attachment 3: Picture_3.png  57 kB  | Show | Show all
Attachment 4: Picture_4.png  41 kB  Uploaded Tue Sep 14 10:19:09 2010  | Show | Show all
Attachment 5: Picture_5.png  22 kB  Uploaded Tue Sep 14 12:28:09 2010  | Show | Show all
Attachment 6: Picture_3.png  60 kB  Uploaded Tue Sep 14 12:28:32 2010  | Show | Show all
Attachment 7: Picture_2.png  41 kB  Uploaded Tue Sep 14 12:28:43 2010  | Show | Show all
Attachment 8: Picture_1.png  72 kB  Uploaded Tue Sep 14 12:28:55 2010  | Show | Show all
ELOG V2.9.2-2455