OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 323     Entry time: Thu Jul 29 18:12:38 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: 16O3+ Setup 

So... the long-awaited word to switch OLIS beams and sources finally came through... at 17:45. Luverly. Anyway, we're on it. Basic idea: 4He1+/MWS -> 16O3+/MCIS. Users only care about A/q being as close to 72/13 as possible using standard beams. Last moments of 4He beam shown below. MWS is running very nicely.

Later... Supernanogan is up and delivering 16O3+. Note that MWS solenoid valves and flow controller are just so for this to be possible. Leave them alone.

Later... Mass scans and some optimization. All better. Intensity is still drifting and will overnight.
Attachment 1: Picture_2.png  44 kB  | Show | Hide all
Attachment 2: Picture_3.png  45 kB  Uploaded Thu Jul 29 20:03:42 2010  | Show | Hide all
Attachment 3: MCIS_Mass_Scan_29-Jul-2010.png  179 kB  Uploaded Thu Jul 29 23:45:22 2010  | Hide | Hide all
MCIS_Mass_Scan_29-Jul-2010.png
Attachment 4: MCIS_Mass_Scan_Zoom_29-Jul-2010.png  170 kB  Uploaded Thu Jul 29 23:47:08 2010  | Show | Hide all
Attachment 5: MCIS_16O3_Setup_29-Jul-2010.png  193 kB  Uploaded Thu Jul 29 23:49:19 2010  | Show | Hide all
Attachment 6: 16O3_on_FC6_29-Jul-2010.png  90 kB  Uploaded Thu Jul 29 23:49:46 2010  | Show | Hide all
ELOG V2.9.2-2455