OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 320     Entry time: Tue Jul 27 08:55:49 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: OLIS Maintenance 

Today we switch from 74Ge1+ to 4He1+, about as wide a switch as we've done at OLIS. We will use the MWS for the 4He.

Later... sources lit. First mass scan attached. Intensity is pretty low for now.

Later... MWS optimized better. Optimal He gas pressure is somewhere between zero and the leakthrough rate on the flow controller set at zero. Stripchart attached. ICR will play with source and beam as it is for now.

Later... ICR has found a few enA in there, and vested parties are happy with the beam.

Attachment 1: Picture_4.png  56 kB  Uploaded Tue Jul 27 12:15:59 2010  | Hide | Hide all
Picture_4.png
Attachment 2: Picture_5.png  42 kB  Uploaded Tue Jul 27 12:42:57 2010  | Show | Hide all
Attachment 3: Picture_6.png  44 kB  Uploaded Tue Jul 27 14:42:17 2010  | Show | Hide all
ELOG V2.9.2-2455