OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 311     Entry time: Mon Jul 12 10:55:14 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: 16O1+ at 32.64keV for accelerator commissioning 

Beam used sporadically over the weekend. Note temperature response in beam. A power bump occurred at about 10:00, knocking out OLIS. It was challenging to come back to where it was before.

Attachment 1: Picture_1.png  52 kB  | Hide | Hide all
Picture_1.png
ELOG V2.9.2-2455