OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 310     Entry time: Fri Jul 9 10:00:03 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: 16O1+ at 32.64keV for accelerator commissioning 

Source drifted overnight. Operators made a slight correction to silence an alarm. I have tweaked this up. Shown below are before and after. Marco believes present beam is unstable. I will see if I can tweak up the intensity, and perhaps that will satisfy all requirements.

Later... ~13:00 this is just about as good as it gets. Stripchart of the last couple of hours plus current excellent source parameters appended below.

Attachment 1: Picture_6.png  44 kB  | Show | Show all
Attachment 2: Picture_7.png  34 kB  | Show | Show all
Attachment 3: Picture_8.png  43 kB  | Show | Show all
Attachment 4: Picture_9.png  50 kB  | Show | Show all
Attachment 5: Picture_10.png  51 kB  | Show | Show all
Attachment 6: Picture_1.png  43 kB  Uploaded Fri Jul 9 14:09:06 2010  | Show | Show all
Attachment 7: Picture_2.png  44 kB  Uploaded Fri Jul 9 14:58:05 2010  | Show | Show all
Attachment 8: Picture_3.png  43 kB  Uploaded Fri Jul 9 14:58:15 2010  | Show | Show all
ELOG V2.9.2-2455