OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 307     Entry time: Tue Jul 6 19:10:33 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: OLIS Maintenance 

Source pulled down for Mg removal and cleanup. Done. Supernanogan refurbishing of MCIS optics complete, plus a comple of other items. Opened joints leackchecked and okay. MCISIOC was in a partial state, where devices worked but not interlocks. It turns out that Controls knows about this. Msg to investigate in the morning. Meanwhile, MWS is up with a 16O1+ beam on FC6 presently. FYI, the vacuum pumpdown curve during leakcheck and startup operations.

Attachment 1: grab.CK3013.png  39 kB  | Hide | Hide all
grab.CK3013.png
ELOG V2.9.2-2455