OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 298     Entry time: Mon Jun 21 09:20:30 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: 26Mg6+ for TUDA-II 

Beam waiting quietly on FC6. There was a power bump on Friday just after noon that tripped the world. Keerthi restarted OLIS. Beam never really came back to its former glory. We'll see if there might be an opportunity to touch it up.

Later... Mag stability program reset required. Internal field probe is at its limit. Hmmm... Meanwhile, revert to EPICS field probe, which unfortunately is not temperature-compensated.

Attachment 1: Picture_1.png  47 kB  | Show | Hide all
Attachment 2: grab.oS5646.png  18 kB  Uploaded Mon Jun 21 15:20:25 2010  | Hide | Hide all
grab.oS5646.png
ELOG V2.9.2-2455