OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 296     Entry time: Wed Jun 16 10:12:58 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: 26Mg6+ for TUDA-II 

Beam idle overnight. Beam is being used as a pilot beam for this run. Source was knocked off by a power bump on Monday evening. Signs are that the root cause is the same as last time, loss of 24V to the IOS interlock panel.

Attachment 1: Picture_1.png  36 kB  | Hide | Hide all
Picture_1.png
ELOG V2.9.2-2455