OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 269     Entry time: Thu May 13 09:25:38 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: 22Ne2+ at 22.44keV for SEBT1 

Beam continues to be reserved for E1147 pilot beam use. Beam was nice and stable overnight, as expected. Beam (blue) followed source (red), independently of ambient temperature, roughly reflected in the nearby Supernanogan plasma chamber temperature (maroon).

Later... at 10:14 today there was a sitewide power bump due to an HPL test. It tripped the cyclotron and one isolated ISAC ion gauge. The ICR operators saw the bump in the lights. OLIS went through it transparently, a fruit of a Maintenance a few weeks back.

Later... at around 17:00 I started the Supernanogan plasma. It is at low RF power for conditioning. HV is off.Gate valve into IOS remains closed.

Attachment 1: Picture_1.png  57 kB  | Hide | Hide all
Picture_1.png
Attachment 2: Picture_2.png  58 kB  Uploaded Thu May 13 14:36:59 2010  | Show | Hide all
ELOG V2.9.2-2455