OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 250     Entry time: Wed Apr 21 15:30:09 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: 16O1+ at 32.64keV for accelerator commissioning 

Beam up as of last evening. Controls performed some network upgrades today, which impacted beam operations. One glitch on our side: OLIS:MB drive bit was lost. Fault report. Otherwise, all's right with the world, and Sophia has resumed accelerator development.

Attachment 1: Picture_8.png  47 kB  | Hide | Hide all
Picture_8.png
ELOG V2.9.2-2455