Message ID: 237     Entry time: Fri Mar 26 09:31:04 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: 20Ne1+ at 40.8keV for accelerator commissioning 

Beam idling overnight. Yesterday ICR called me regarding an IOSIOC reboot and consequent fallout. In short, it turned off IOS:MB. Not good. While the fix was easy enough, it took time to find it, which would translate to downtime during regular delivery. A lesson learned. I just noticed now that the magnet stability program was out of range and obviously had been since the IOC reboot. I reset the power supply and field. This procedure will need to be integrated into the ICR routines for IOS. Attached is a Stripchart over the period.