OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 235     Entry time: Wed Mar 24 11:42:32 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: 20Ne1+ at 40.8keV for accelerator commissioning 

Beam is on standby. Target snapshot in IOPS elog.  Over the last little while...

* IOS:IG1 repaired last evening. IOS vented to Ar, flowing for duration of repair. Standard Varian filament repair kit used with Dimo's instructions. Pumpdown and leak-up curve to be attached shortly.

* IOS:FC1 operation restored after cup was replaced during Shutdown. Being a safety cup, it required the air solenoid configured opposite to standard cups. Correct fix: Rotate solenoid 180*. Bias fails to come on automatically upon insertion. This is a completely separate fault, and likely predates cup replacement. Bias can still be switched on manually at any time.

* IOS:MB stability program was off during Shutdown and would not come back willingly. Investigated, and found blown fuse in output circuit. Fuses are 5A in a 4A circuit. Replace and go. Also added another ferrite core to serial cable between power supply and server.

* MCIS RF amplifier controls a week ago. For reasons yet unknown, the system lost its 2009 running configuration. Significant Controls work to restore. More work planned.

 

Attachment 1: Picture_9.png  21 kB  Uploaded Thu Mar 25 13:47:33 2010  | Hide | Hide all
Picture_9.png
ELOG V2.9.2-2455