Message ID: 233     Entry time: Wed Mar 17 09:25:27 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: 20Ne1+ at 40.8keV for accelerator commissioning 

20Ne1+ set up from the MWS and handed over to Sophia & Marco for accelerator recommissioning. Strip to 5+ at M:5. First day of beam. Happy St. Patrick's Day.

Later... a Stripchart of beam today: baby-blue trace is FC6. Also, here are screenshots of the source.

..................................................................................

Lots happened during OLIS Shutdown. In no particular order:

* DB1/3 optics refurbished.

* IOS:FC3 replaced.

* MWS refurbished.

* MWS microwave generator water interlock fixed.

* IOS:IG1 requires filament. Pending available window to vent.

* IOS:RP1 scroll pump refurbished. Base pressure <<14mTorr.

* IOS:MB vacuum box liners removed.

* IOS overpressure valve installed on DB6.

Attachment 1: Picture_2.png  57 kB  Uploaded Wed Mar 17 14:37:52 2010  | Hide | Hide all
Picture_2.png
Attachment 2: Picture_3.png  45 kB  Uploaded Wed Mar 17 15:00:39 2010  | Show | Hide all
Attachment 3: Picture_4.png  43 kB  Uploaded Wed Mar 17 15:00:51 2010  | Show | Hide all