OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 229     Entry time: Fri Feb 19 17:54:40 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: OLIS Shutdown in progress 

Partial disassembly of DB1 optics today. Shielding of insulators is definitely working and indicated for unshielded insulators. Discussion of possibilities in progress. Wiring looks good, but one Kapton wire snapped at the connector upon disassembly (no force required).

Attachment 1: DSCN7351.JPG  428 kB  | Show | Show all
Attachment 2: DSCN7355.JPG  381 kB  | Show | Show all
ELOG V2.9.2-2455