OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 217     Entry time: Thu Dec 24 10:13:00 2009
Author: Damien Gallop 
Type:  
Category:  
Subject: OLIS development 20Ne1+ from MWS 

The MWS stayed up flawlessly overnight. Beam grew from about 2µA to over 5µA this morning. Was it the pre-conditioning of the RF generator? We will look at the beam for a bit now, then shut it down for Christmas.

Attachment 1: Picture_5.png  114 kB  | Hide | Hide all
Picture_5.png
ELOG V2.9.2-2455