OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 203     Entry time: Thu Dec 3 14:12:56 2009
Author: Damien Gallop 
Type:  
Category:  
Subject: 20Ne1+ at 28keV for 8pi delivery continues 

Beam was idle overnight. We took the beam for a while this morning, and ran a mass scan. We opted to not go into the cage to install helium gas lines or fix water lines, because it would mean switching off the source. So we will do the gas tomorrow or so, and fix the water leaks then too.

Note that the separator field is up about 4G from this morning.

Attachment 1: Picture_20.png  103 kB  | Show | Show all
ELOG V2.9.2-2455