OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 195     Entry time: Thu Nov 26 16:08:42 2009
Author: Damien Gallop 
Type:  
Category:  
Subject: OLIS development for CUSP source - installation cont'd 

Services completed today. There are still some teething pains, particularly the arc p/s as noted earlier. But we did have some beam on around noon for the first time, using neon source gas. Plan is to install helium source gas at the last minute, after all other checks, particularly leak checks, and a background calibration are done.

Later... IOS:BP1 made some clanking noises about a half hour ago, something like a car I used to own. Pump vacuum bumped at the time. See stripchart below. Quiet now, and pressure okay. ICR is keeping a watch.

Later... I closed off the source gas hand valve at 18:00 for the night, in case the scroll pump breaks and ICR has to shut down the turbos, etc.

Attachment 1: grab.I31500.png  31 kB  Uploaded Thu Nov 26 17:57:00 2009  | Show | Show all
ELOG V2.9.2-2455