Supernanogan Development begins. It will be a marathon. Main goals are high-charge emittance scans and RF frequency scans. Tall order.

Meanwhile, the MWS came out as planned. Thank goodness for the quartz liner, which took most of the hit from the magnesium. IOS optics are another story. We are running with an alternate tune for Q1/Q2/Q3, as noted elsewhere. The Supernanogan, already at vacuum, pumped down nicely, as did IOS and the IM section. Basically it was a weekend of HV conditioning. Mostly as expected. We got to a solid 27kV. Plasma lit and 22Ne2+ beam tune installed and beam on FC6 for hours. I'll include a stripchart if I can find one.

Preliminary mass scan. It looks okay. Slits are wide-open. Yes, I found a 22Ne2+ FC6 stripchart too.

Next:

  • Slits in: done.
  • Check A/q calibration: change const22 from .04156 to 0.041777 based on 22Ne position.
  • Mass scan:
Attachment 1: Picture_43.png  191 kB  | Show | Hide all
Attachment 2: grab.a30699.png  17 kB  Uploaded Mon Aug 17 14:59:44 2009  | Hide | Hide all