OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 128     Entry time: Fri Aug 14 13:53:34 2009
Author: Damien Gallop 
Type:  
Category:  
Subject: MWS 25Mg end of run data 

Marco gave us the all-clear this morning to shut down the MWS. We are preparing to remove the MWS head from the Y-box and blank it off, in order to maximize the vacuum around the Supernanogan. I have advised Marco of our intention to do this and that there is no going back. He is good with that. More in a bit.

Here is a stripchart of the 25Mg beam. The EE was off for the night. Turning it on restored beam immediately. It reached equilibrium after about three hours. pretty good, and pity that we have to shut it down now. Save: 090814_1352.snapiosfc6.

Emittance scans with beam as-is and with slits out. Best I could do, Rick.

P.S. At the bottom I added a couple of charts of the separator field. The stability system is working very well indeed. You can see it active and inactive over the last few days in the trar plot.

Attachment 1: grab.dd8454.png  19 kB  | Show | Hide all
Attachment 2: grab.cG8481.png  17 kB  Uploaded Fri Aug 14 14:54:33 2009  | Show | Hide all
Attachment 3: grab.Ex8492.png  12 kB  Uploaded Fri Aug 14 14:56:43 2009  | Show | Hide all
Attachment 4: grab.EK8497.png  12 kB  Uploaded Fri Aug 14 14:56:53 2009  | Show | Hide all
Attachment 5: grab.Bf8605.png  21 kB  Uploaded Fri Aug 14 15:02:56 2009  | Show | Hide all
Attachment 6: grab.BY8609.png  14 kB  Uploaded Fri Aug 14 15:03:08 2009  | Show | Hide all
Attachment 7: grab.dc8644.png  23 kB  Uploaded Fri Aug 14 15:07:53 2009  | Show | Hide all
Attachment 8: grab.Hv8648.png  15 kB  Uploaded Fri Aug 14 15:08:02 2009  | Show | Hide all
Attachment 9: Picture_38.png  99 kB  Uploaded Fri Aug 14 15:14:32 2009  | Show | Hide all
Attachment 10: Picture_40.png  74 kB  Uploaded Fri Aug 14 15:17:19 2009  | Hide | Hide all
Picture_40.png
ELOG V2.9.2-2455