OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 127     Entry time: Tue Aug 11 09:54:28 2009
Author: Damien Gallop 
Type:  
Category:  
Subject: MWS 25Mg operation overnight & MCIS cart installation 

As noted earlier, the MWS beam dropped out at some point after yesterday afternoon's playtime, due to insufficient PE. Plasma was lost. I restarted the source remotely. The present combination of Ne flow SP = 1.2ccm and PE = 48V works well. Plasma will persist regardless of Mg presence or PE setting. That's a good thing. Then using the PE we can control how the plasma ionizes the Mg material. Note the attached stripcharts. At the lower PE settings, the Mg loading on the EE is much reduced and indefinitely sustainable at those levels.

Presently the source is off for Supernanogan cart installation. We will have it in and buttoned up by around noon.

Attachment 1: grab.Z26532.png  19 kB  Uploaded Tue Aug 11 10:56:16 2009  | Hide | Hide all
grab.Z26532.png
Attachment 2: grab.Y26538.png  19 kB  Uploaded Tue Aug 11 10:56:25 2009  | Show | Hide all
ELOG V2.9.2-2455