M9sol Logbooks Solenoid Daily log
  Solenoid logbook, Page 9 of 15  ELOG logo
Entry  Thu Jul 20 00:52:13 2006, Doug Preddy, Quench Recovery, T1 frozen 
T1 will not spin up. Warming up cold box.
Entry  Thu Jul 20 02:59:06 2006, Doug Preddy, Quench Recovery, T1 still not starting 
I will leave the cold box to warm overnight and try it again in the morning.
Entry  Thu Jul 20 08:18:31 2006, Doug Preddy, Quench Recovery, T1 started 
Started flow to turbines. Both started. T1 seems a bit slow. HIC110 at 0.85 
SI110 = 4100.
Cool down started.
Entry  Fri Jul 21 07:39:37 2006, Doug Preddy, Quench Recovery, Cool down continues 
Raised PIC229 to 11Bar. Started to close HIC155. Cooling rates improve.
Entry  Fri Jul 21 14:08:04 2006, Doug Preddy, Quench Recovery, switch to series mode 
Coils temps <10K.Switching to series mode.
Entry  Fri Jul 21 23:36:21 2006, Doug Preddy, Quench Recovery, Final cooldown problems 
80K shield is down to <60K Liquid level not building. Power leads rippling 
and warming. T1 inlet 85K with 10%heater load.
Lowered the set point of TI121 to 17K. Shut off flow to the 80K shield to 
try and warm them. Turbine 1 inlet temp dropping (83K)
Power leads cooled and stablized, coil temps came down. Leaving it for 1/2 
hour to evaluate.
Entry  Fri Jul 28 20:39:40 2006, Doug Preddy, Quench Recovery, Restarting refrigerator 
Solenoid quenched at about 6:00 tonight.
I restarted the compressor, then the cold box and turbines. When cold box 
was at 25K I started flow to the solenoid in parallel cold return.
Entry  Sat Jul 29 05:30:28 2006, Doug Preddy, Quench Recovery, switched to series mode 
Temps bottomed out at ~16K. Switching to series mode.
Entry  Sat Jul 29 09:38:06 2006, Doug Preddy, Quench Recovery, power leads cooled 
opened power lead flow about 40 minutes ago. ~12K will let them stablize. 
LHE level >20%
Entry  Tue Aug 8 07:27:49 2006, Doug Preddy, Quench Recovery, Solenoid Quench at about 6:00 this morning 
No indication of problem. Turbines still running, but no flow to solenoid. 
Started flow. Solenoid ~20K.
Entry  Wed Aug 9 07:50:49 2006, Doug Preddy, Quench Recovery, Switched to series mode. 
Cool down continues.
Entry  Thu Aug 10 08:33:44 2006, Doug Preddy, Normal Running, Running low on helium 
Temperture okay, but there are fluctuation in the power leads. PIC229 is 
trying to charge. The buffer tank pressure is just >0 psi. I will lower the 
liquid level to 40% to allow some helium to boil off into the buffer tank.
Entry  Tue Aug 15 08:45:56 2006, Doug Preddy, Quench Recovery, restarted the compressor 
Solenoid tripped off Sunday. Restarted compressor and cool down of cold box.
Entry  Thu Aug 17 08:04:44 2006, Doug Preddy, Quench Recovery, Solenoid tripped at about 3:00 this morning 
restarting system.
Compressor would not start. Idid not see anything that would not let it 
start. Pushed rest button upstairs, and reset contactor. Compressor started.
preparing to start flow to solenoid in // cold return.
Entry  Wed Oct 4 07:29:04 2006, Doug Preddy, Start Up, Starting cool down 
Started compressor yesterday with flow through the purifier overnight.
Starting tubines this morning in parallel warm return
Entry  Thu Oct 5 10:26:26 2006, Doug Preddy, Start Up, switched to parallel cold return 
 
Entry  Thu Oct 5 11:51:53 2006, Doug Preddy, Start Up, Adde 2 bottles UHP Helium 
Valved off purifiers, but left LN2 on.
Entry  Thu Oct 5 14:53:54 2006, Doug Preddy, Start Up, Switched to series mode 
 
Entry  Thu Oct 26 08:18:10 2006, Doug Preddy, Quench Recovery, switched to series mode 
Switched to series mode at about 7:45.
Entry  Thu Oct 26 11:45:22 2006, Doug Preddy, Quench Recovery, Solenoid cold 
power leads cold 50% liquid.
Turning on power supply
ELOG V2.9.2-2455