M9sol Logbooks
Solenoid
Daily log
Solenoid logbook, Page 2 of 15
New
|
Reply
|
Find
|
Delete
|
Last day
|
Help
|
Config
Full
| Summary |
Threaded
286 Entries
Goto page
Previous
1
, 2,
3
...
13
,
14
,
15
Next
All
ID
Date
Author
Operational Mode
Subject
Text
118
Thu May 25 07:34:18 2006
Doug Preddy
Start Up
switched to parallel cold return
switched to parallel cold return
159
Tue Aug 15 15:39:27 2006
Willy Andersson
Quench Recovery
switched to parallel cold return
Return flow temps from solenoid about 40K,
TIC121 at about 40K so switching
to //cold return.
164
Thu Oct 5 10:26:26 2006
Doug Preddy
Start Up
switched to parallel cold return
199
Thu May 31 07:11:05 2007
Doug Preddy
Quench Recovery
switched to parallel cold return
switched to parallel cold return earlier this
morning. Vacuum is 5 x 10-5.
222
Wed Sep 26 08:52:46 2007
Doug Preddy
Start Up
switched to parallel cold return
246
Wed Apr 16 16:51:16 2008
Doug Preddy
Start Up
switched to parallel cold return
277
Fri Apr 9 07:34:55 2010
Doug Preddy
Quench Recovery
switched to parallel cold return
Switched to parallel cold return at about
7:30 this morning
285
Thu Nov 11 15:46:40 2010
Doug Preddy
Other
switched to parallel cold return
At 14:45.
20
Fri Apr 30 01:53:34 2004
Doug Preddy
Quench Recovery
switched to parallel cold
38
Thu Jul 29 09:01:11 2004
Doug Preddy
Quench Recovery
switched to parallel cold
Changed to series mode.
10
Wed Apr 21 08:16:18 2004
Doug Preddy
Start Up
switch to series mode
Switched to series mode.
34
Wed Jul 28 07:00:18 2004
Doug Preddy
Quench Recovery
switch to series mode
Switching to series mode. Jumper on vacuum
gauge removed.
55
Wed Oct 6 09:25:54 2004
Doug Preddy
Start Up
switch to series mode
switched to series mode
107
Tue Jul 19 16:13:32 2005
Willy Andersson
Quench Recovery
switch to series mode
CR_6KS_M down to 11 K.
Switched to series mode.
Started small flow to power leads to get
144
Fri Jul 21 14:08:04 2006
Doug Preddy
Quench Recovery
switch to series mode
Coils temps <10K.Switching to series mode.
177
Tue Oct 31 05:36:14 2006
Doug Preddy
Quench Recovery
switch to series mode
182
Wed Nov 15 13:56:00 2006
Doug Preddy
Quench Recovery
switch to series mode
256
Sun Aug 24 06:45:14 2008
Doug Preddy
Quench Recovery
switch to series mode
268
Wed May 27 13:37:22 2009
Doug Preddy
Quench Recovery
switch to series mode
Switched to series mode at ~11:00. Built
liquid to 55% by 13:30. Started flow to the
power leads.
161
Thu Aug 17 19:45:27 2006
Willy Andersson
Quench Recovery
switch to series cooling
Temps of flow returning from solenoid flat
lined at about 10K.
Gradually closed CV155.
Goto page
Previous
1
, 2,
3
...
13
,
14
,
15
Next
All
ELOG V2.9.2-2455