Entry  Wed Dec 10 15:44:58 2008, Doug Preddy, Maintenance, Repairs to solenoid power supply 
Klaus and company pulled the ramp rate card out of the solenoid power supply. Operational checks were done and the rate switch was cleaned. The card was
reinserted and the ramp rate was checked. The power supply seems to ramp at a proper rate in all positions. ***Note*** The output voltage of the power
supply is proportional to the ramp rate. The faster the ramp rate the higher the output voltage.
Entry  Wed Dec 10 15:41:04 2008, Doug Preddy, Shut Down, shuttting down solenoid 
shuttting down solenoid for winter shutdown.
Entry  Wed Nov 5 16:33:52 2008, Doug Preddy, Normal Running, sbplc light out 
On main menu the sbplc light was black. All vacuum systems looked good, but there was no control of any device. Jane reset the IOC. It is hosted by sundance.
Entry  Sun Oct 5 18:54:27 2008, Doug Preddy, Quench Recovery, Solenoid Quench ~16:30 
Restarted compressor and flow to coldbox by 18:30
Entry  Sun Oct 5 11:12:48 2008, Doug Preddy, Normal Running, M9B:V1 interlocks and a IOC crash 
M9A:V1 was removed this shutdown. It's "in" limit is required to allow M9B:V1 to be opened. I have bypassed the interlocks on M9B:V1 until the M9A:V1 limits
can be jumpered. Don Dale and George Clark have been informed.
Also an IOC crashed so the data pages were not updating. Evgeny rebooted the IOC. All is
now fixed.
Entry  Fri Sep 26 09:50:18 2008, Doug Preddy, Quench Recovery, started flow in parallel cold return mode 
 
Entry  Fri Sep 26 09:45:18 2008, Doug Preddy, Quench Recovery, Solenoid quenched at 7:50 
Compressor on. Turbines started. Vacuum system recovering.
Entry  Fri Sep 26 09:44:25 2008, Doug Preddy, Maintenance, Water flow interlock restored 
yesterday
Entry  Tue Sep 9 15:04:23 2008, Doug Preddy, Maintenance, Jumpered interlock for diff pump water flow 
Jumpered interlock for diff pump water flow in Proteus box.
Entry  Thu Sep 4 10:02:55 2008, Doug Preddy, Normal Running, ramping down solenoid 
Solenoid power supply will be turned off for Fall shutdown.
Entry  Sun Aug 24 06:45:14 2008, Doug Preddy, Quench Recovery, switch to series mode 
 
Entry  Sat Aug 23 17:02:38 2008, Doug Preddy, Quench Recovery, Solenoid quenched 
The solenoid quenched this afternoon at ~12:30. The compressor shut down. Fault lights were cold box trip.
Restarted the compressor by 3:30 and started
flow to the solenoid by 4:15.
Peter Yandon came down with Ops' radio to investigate the radios may trip the solenoid. When the radio is keyed the vacuum
guages jump. CG1, CG5 and the pirani gauges. This would trip of the refrigerator. More investigation to happen tomorrow and on maintenance day.
Entry  Sat Jul 26 01:29:21 2008, Doug Preddy, Quench Recovery, power leads 
ops will monitor liquid level. When it's at 60% they will come down and open the power lead valve. When the temperature ripples die out the solenoid can
be energized.
Entry  Sat Jul 26 01:06:04 2008, Doug Preddy, Quench Recovery, Refrigerator in series mode 
Switched to series mode. Solenoid ~8K, starting to build liquid. 
Entry  Fri Jul 25 21:48:15 2008, Doug Preddy, Quench Recovery, another quench 
System was stable and solenoid ramped up at 4:00 today. At about 7:30 it tripped off again. I came in and restarted the compressor and am now cooling in
parallel cold return mode. Solenoid is at ~30K. I talked to Kevin and he will get the power leads on tomorrow morning. Once they are stable the power supply
can be ramped up. 
I phoned Curtis, but there was no answer (he may be on holidays??)
Entry  Thu Jul 24 16:28:50 2008, Doug Preddy, Quench Recovery, power bump 
There was a power bump at ~15:00 today. All mseon hall cooling water went off. Compressor tripped. Main magnet went off. 
Restarted compressor after water
pumps came back on. Started flow to the cold box. Compressor outlet pressure went >12 Bar and tripped of the compressor. Restarted again and am now cooling
in parallel cold return. Solenoid ~25K.
Entry  Tue Jul 15 08:47:13 2008, Doug Preddy, Normal Running, Screen grab of normal running july_15_08_0841.jpgjuly_15_08_0846.jpg
Solenoid was recovered on Sunday July 13. The power leads started to ripple slightly this morning, so I cycled HIC142. No real change. 
Entry  Sun Jul 13 20:17:24 2008, Doug Preddy, Other, Helium refrigerator problems 
In early June the helium compressor was running with the solenoid cold. A vavlve broke off at the suction side of the compressor. The entire helium inventory
was lost. The cold box tripped off, but the compressor did not. It ran for ~ 2 hours before I came in and shut the system down. The valve was repairedby
Kevin T and Neil Wong. We ran hot (>100C) nitrogen through the fourth adsorber for one week. The solenoid and cold box were allowed to warm above 273C.
Entry  Mon Apr 28 09:03:22 2008, Doug Preddy, Normal Running, power leads warmed during weekend 
The power lead temperatures suddenly rose on Sunday morning. No rippling occured before the woarm up. 
I shut flow off this morning for about 10 minutes
(until the LHe in went up to 30K) and then open the flow back up. The temperature seem to be recovering.
Entry  Thu Apr 17 13:52:25 2008, Doug Preddy, Start Up, switched to series mode at 9:30 this morning 
switched to series mode at 9:30 this morning. Added two bottles of helium gas. 
Started flow to power leads.