switched to parallel cold return
Return flow temps from solenoid about 40K, TIC121 at about 40K so switching to //cold return. Starting with slightly reduced flow through cold returns, CV145 and CV147 at about 65% open.
switched to parallel cold return earlier this morning. Vacuum is 5 x 10-5.
Switched to parallel cold return at about 7:30 this morning
At 14:45.
Changed to series mode.
Switched to series mode.
Switching to series mode. Jumper on vacuum gauge removed.
switched to series mode
CR_6KS_M down to 11 K. Switched to series mode. Started small flow to power leads to get them cold. HIC142=0.6 Later open HIC142 wide open. Raised discharge press to 11.4 barA. Letting LHe level build.
Coils temps <10K.Switching to series mode.
Switched to series mode at ~11:00. Built liquid to 55% by 13:30. Started flow to the power leads.
Temps of flow returning from solenoid flat lined at about 10K. Gradually closed CV155. Then switched to series cooling.