M9sol Logbooks Solenoid Daily log
  Solenoid logbook, Page 15 of 15  ELOG logo
ID Date Authordown Operational Mode Subject Text Attachments
  283   Mon Jun 7 09:24:47 2010 Doug PreddyQuench Recoverystarted flow to power leads    
  284   Mon Aug 9 14:27:12 2010 Doug PreddyShut DownHelium plant shut down    
  285   Thu Nov 11 15:46:40 2010 Doug PreddyOtherswitched to parallel cold returnAt 14:45.   
  286   Fri Nov 12 16:54:50 2010 Doug PreddyNormal RunningSolenoid ramped up    
  63   Tue Oct 12 13:00:08 2004 Curtis BallardStart Upcv142 valveCurtis closes and opens slowly at about 11:00
am this morning. Wants to see 
if that works better than the sudden on/off
  
  218   Tue Sep 18 18:48:11 2007 Curtis BallardMaintenancecold box leak checkThe leak check of the cold box diff pump fittings.
 Found a leak at the 
base of the diff pump on the tee that is
  
ELOG V2.9.2-2455