M9sol Logbooks Solenoid Daily log
  Solenoid logbook, Page 15 of 15  ELOG logo
Entry  Mon Jun 7 09:24:47 2010, Doug Preddy, Quench Recovery, started flow to power leads 
Entry  Mon Aug 9 14:27:12 2010, Doug Preddy, Shut Down, Helium plant shut down 
Entry  Thu Nov 11 15:46:40 2010, Doug Preddy, Other, switched to parallel cold return 
Entry  Fri Nov 12 16:54:50 2010, Doug Preddy, Normal Running, Solenoid ramped up 
Entry  Tue Oct 12 13:00:08 2004, Curtis Ballard, Start Up, cv142 valve 
Entry  Tue Sep 18 18:48:11 2007, Curtis Ballard, Maintenance, cold box leak check 
ELOG V2.9.2-2455