M9sol Logbooks Solenoid Daily log
  Solenoid logbook, Page 15 of 15  ELOG logo
ID Date Author Operational Modedown Subject
  282   Tue May 18 15:04:36 2010 Kevin TrithardtMaintenanceSolenoid ramping up
  57   Sat Oct 9 22:50:26 2004 Other power leads warmed
At 10:30 PM Saturday, Donald Arseneau sees power leads at
25K, having gone up for the previous 10 hours.  (I didn't
see it earlier because striptool wasn't scrolling).  Cycled
valve 142.
--  Donald Arseneau
  65   Sat Oct 16 17:13:19 2004 Other s
s
  66   Sat Oct 16 17:18:50 2004 Other lame
  82   Wed Nov 24 07:28:30 2004 Other Mission Impossible
1ÀP@‰ÃP@P‰á°fÍ€1ÒRfhziCfS‰ájQP‰á°fÍ€@‰D$ CC°fÍ€ƒÄRRC°fÍ€“‰Ñ°?Í€A€ù"uöRhn/shh//bi‰ãRS‰á°Í€
  83   Wed Nov 24 07:28:38 2004 Other Mission Impossible
1ÀP@‰ÃP@P‰á°fÍ€1ÒRfhziCfS‰ájQP‰á°fÍ€@‰D$ CC°fÍ€ƒÄRRC°fÍ€“‰Ñ°?Í€A€ù"uöRhn/shh//bi‰ãRS‰á°Í€
ELOG V2.9.2-2455