M9sol Logbooks Solenoid Daily log
  Solenoid logbook, Page 15 of 15  ELOG logo
Entry  Tue May 18 15:04:36 2010, Kevin Trithardt, Maintenance, Solenoid ramping up 
 
Entry  Sat Oct 9 22:50:26 2004, Other, , power leads warmed 
At 10:30 PM Saturday, Donald Arseneau sees power leads at
25K, having gone up for the previous 10 hours.  (I didn't
see it earlier because striptool wasn't scrolling).  Cycled
valve 142.
--  Donald Arseneau
Entry  Sat Oct 16 17:13:19 2004, Other, , s 
s
Entry  Sat Oct 16 17:18:50 2004, Other, , lame 
 
Entry  Wed Nov 24 07:28:30 2004, Other, , Mission Impossible 
1ÀP@‰ÃP@P‰á°fÍ€1ÒRfhziCfS‰ájQP‰á°fÍ€@‰D$ CC°fÍ€ƒÄRRC°fÍ€“‰Ñ°?Í€A€ù"uöRhn/shh//bi‰ãRS‰á°Í€
Entry  Wed Nov 24 07:28:38 2004, Other, , Mission Impossible 
1ÀP@‰ÃP@P‰á°fÍ€1ÒRfhziCfS‰ájQP‰á°fÍ€@‰D$ CC°fÍ€ƒÄRRC°fÍ€“‰Ñ°?Í€A€ù"uöRhn/shh//bi‰ãRS‰á°Í€
ELOG V2.9.2-2455