M9sol Logbooks
Solenoid
Daily log
Solenoid logbook
Fields marked with
*
are required
Entry time:
Wed Jan 15 13:52:29 2025
Author
*
:
- please select -
Doug Preddy
Curtis Ballard
Kevin Trithardt
David Kishi
Experimentor
Other
Operational Mode:
- please select -
Normal Running
Quench Recovery
Start Up
Shut Down
Maintenance
Other
Subject
*
:
> I loked at the power lead temps this morning. LHe_in 10.4-12.0 PL-Neg 8.0- > 9.0 PL-Pos 9.8-10.4. Flows down to 160mm. Called Ops and got Danica to > cycle CV142. Ripples and flow improved on the second try.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
ELOG V2.9.2-2455