M9sol Logbooks
Solenoid
Daily log
Solenoid logbook
Fields marked with
*
are required
Entry time:
Wed Jan 15 14:01:55 2025
Author
*
:
- please select -
Doug Preddy
Curtis Ballard
Kevin Trithardt
David Kishi
Experimentor
Other
Operational Mode:
- please select -
Normal Running
Quench Recovery
Start Up
Shut Down
Maintenance
Other
Subject
*
:
> Came down to check on system. CV211 was fully open, trying to charge the > system. Ripples on LHe in and PL neg. CV141 fully closed. I closed CV147 to > 0.45 to try and move CV141 open. Checked the buffer tank pressure, it was > almost at zero. Lowering the liquid level to 40%.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
ELOG V2.9.2-2455