M9sol Logbooks
Solenoid
Daily log
Solenoid logbook
Fields marked with
*
are required
Entry time:
Wed Jan 15 14:00:22 2025
Author
*
:
- please select -
Doug Preddy
Curtis Ballard
Kevin Trithardt
David Kishi
Experimentor
Other
Operational Mode:
- please select -
Normal Running
Quench Recovery
Start Up
Shut Down
Maintenance
Other
Subject
*
:
> Cold box pumped out to ~ 190 mTorr overnight.Leak checked the pump again. > Still leaks at dip stick.Tried resetting the o-ring on the dip stick. It > still leaks baddd!!! > Machined the old seal off and installed a smaller o-ring onto dip stick. > Installed 60 ml of new pump oil into pump. Pumping down again. > After 4 hours the cold box is down to 160 mTorr.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
ELOG V2.9.2-2455