> 02:30 this morning got page from operations. > Looked at system online, appears that there was a powerlead overtemp > that caused the quench. Compressor still running. After arriving to > work set system to // warm return mode to cool down transferlines. Lhe > level starts to boil away. Switch to // cold return mode. Discovered that > seem to get better cooldown rate by not opening supply valves to solenoid > fully. // cold return valves are fully open but both CV143 and CV146 are > only open to 0.55 giving mu1 and mu2 inlet pressures of 2 barA. Getting > good cool down rates and even building LHe level. > > 04:25 C1 down to 8K, C12 at 7.5K, C6 at 7.5K, 6KS_M at 10.5K
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
ELOG V2.9.2-2455