M9sol Logbooks
Solenoid
Daily log
Solenoid logbook
Fields marked with
*
are required
Entry time:
Wed Jan 15 13:35:52 2025
Author
*
:
- please select -
Doug Preddy
Curtis Ballard
Kevin Trithardt
David Kishi
Experimentor
Other
Operational Mode:
- please select -
Normal Running
Quench Recovery
Start Up
Shut Down
Maintenance
Other
Subject
*
:
> 80K shield is down to <60K Liquid level not building. Power leads rippling > and warming. T1 inlet 85K with 10%heater load. > Lowered the set point of TI121 to 17K. Shut off flow to the 80K shield to > try and warm them. Turbine 1 inlet temp dropping (83K) > Power leads cooled and stablized, coil temps came down. Leaving it for 1/2 > hour to evaluate.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
ELOG V2.9.2-2455